Golf Course Irrigation

With a range of quality products behind us and skilled and experienced personnel to support them, NewGround continues to be a leader in water management in Western Australia and beyond. We offer a full range of services from irrigation design to construction and ongoing maintenance services. Our philosophy is simple – listen and connect with our client’s vision, develop long lasting partnerships and provide innovative solutions.  
NewGround Water Services has the experienced staff and necessary equipment to consult, design, install and maintain any Golf Course water application. We believe in giving our clients different options so they can make informed decisions.

Consultation

Being involved with each Golf project from the start so that superintendents can make informed decisions about their irrigation system.

Design

Our Certified Irrigation Designers (CID) can design your new or replacement irrigation system using the latest and most innovative products on the market.

Installation

Our installers have extensive experience in Golf Course irrigation and can even use the latest installation methods for minimal disturbance to turf.

Maintenance

From supply only of goods from Rainbird and Toro, or emergency call-outs. You can rely on NewGround to service your Golf Course from start to finish.

Recent Golf Courses Completed

Hamersley Golf Course

NewGround partnered with LD Totals to replace the existing irrigation to 18 holes including mainline, laterals and the installation of a new control system. There were 7,500 metres of mainline - all of which was turfed. NewGround relayed the turf and watered it in daily. There was 16,000 lineal meters of 63mm poly pipe that was ploughed through the fairways to eliminate any disturbance to the turf. NewGround also worked closely with Toro Australia to install a new central control system, working closely with the City of Stirling, and the Golf superintendent to keep the existing irrigation running whilst installing a brand-new system. Throughout this project NewGround was very mindful of pedestrian safety and always insured the work site was kept in a tidy condition. NewGround worked with the City of Stirling, LD Totals and the Hamersley golf course superintendent to close down 1 hole at a time, this ensured pedestrians were kept away from the area of works.

Cottesloe Golf Club

NewGround was contracted by the Cottesloe Golf Club Inc to replace the existing irrigation to 18 Holes including mainline, laterals, central control system and a new pump station. The project was split into multiple stages for funding, and to minimise disturbance to the course and patrons using the grounds. There were 6,500 meters of mainline ranging from 100mm PVC to 300mm PVC- all of which had the turf lifted, and reinstated. NewGround relayed the turf and watered it in daily, and any damaged turf was replaced with new. There was 10,000 lineal meters of 63mm poly pipe that was ploughed through the fairways to eliminate any disturbance to the turf. NewGround also worked closely with Rainbird to install a new central control system and the Cottesloe Golf Course superintendent to keep the existing irrigation running whilst installing a brand-new system. Throughout this project NewGround was very mindful of pedestrian safety and always ensured the work site was kept in a tidy condition. NewGround worked with golf course superintendent to close down 1 hole at a time, this ensured pedestrians were kept away from the area of works.

Follow

  • LinkedIn